| 1. The site before work commenced on which stood a 200 year old stone ruin. |  |
| 2. The mid-way point of demolition. The one meter plus thick walls were constructed simply of stone and soil with some render on the weathered south elevation.. |  |
| 3. Nearing the end of demolition – all the stone and soil was removed by hand to save all re-useable stone for use in the construction of the new property.. |  |
| 4. The bulldozers move in to clear the site and break out rock to the required depth.. |  |
| 5. Approaching the final stages of levelling, the site is almost ready for marking out and the foundation trenches to be dug.. |  |