1. Trenches have been excavated from the levelled site and re-enforcement steels fitted along with steps accross the site.Property Development in West Cork
2. The steels accross the front section are set on 30m3 of lean concrete which was poured in excavation to stabilize the deep trenches that were required.Property Development in West Cork
3. And early start for the first of six loads of readymix concrete needed to fill the stepped and re-encorced foundation trenches.Property Development in West Cork
4. After the pour, levelling and screeding, the foundations are now complete and after curing, will be ready for deadwork blocking..Property Development in West Cork